Day 1 is complete as Eric, Eric, Josh and Josh (nope, not kidding) have finished the tear-out of the upstairs bath.
While I'm happy to report the tile came out easily (money-saver) I'm less thrilled to report that they discovered the floor actually has a gradual slope to it. And by "gradual slope" I mean there is a difference of nearly two inches between the door and the wall 6 feet away. So we'll have to fix that (money-sucker).
I've been waiting to purchase the "little things"- shower fixtures, lights, dishwasher, sink - until the biggest part of the tear-out was done and I knew how much it was going to cost (not knowing what was under the floor, we faced a range that spanned almost $1000 dollars!) With that in mind, I have an A-, B-, and C-list of the things I'd like, and it looks like we'll be going with the B-list items in order to make up some of the cost that will go into fixing the floor, now. Luckily, there are still some good deals to be had and I'm off to get them!
Photos!